Construction material logistics

Mondrian Gold Coast
Render Delivery Program

Coordinated courier and crane-truck delivery of Dulux Acratex render and texture materials into a major live construction environment at Burleigh Heads.

ProjectMondrian Gold CoastPrimary customerDulux AcratexSite builderHutchinson Builders
50+Pallets of render and texture materials
50+ tMaterials transported to site
2 fleet typesCourier and crane-truck delivery capability
Live siteTimed access within an active build program
Mondrian Gold Coast hotel and residences at Burleigh Heads

Mondrian Gold Coast: a premium mixed-use beachfront development at Burleigh Heads.
The project

Dulux Acratex material flow for a landmark beachfront build.

Foley Logistics supported Dulux Acratex through the coordinated delivery of render and texture materials for the Mondrian Gold Coast development, working around the Hutchinson Builders site program.

The project brought Australia’s first Mondrian property to Burleigh Heads. Hutchinson Builders records the completed development as two towers linked by a level-three podium, with 84 private residences, 208 guest rooms and a five-star hotel offering.

For Foley Logistics, the requirement was practical and exacting: keep Dulux Acratex finishing materials moving into a busy construction site, align every delivery with access and program requirements, and deploy the right vehicle for each load.

Primary customerDulux Acratex
LocationBurleigh Heads, QLD
Site builderHutchinson Builders
Foley scopeRender material logistics
The operating challenge

Deliver the right Dulux Acratex material, in the right sequence, without disrupting the site.

High-rise construction logistics are controlled by access, timing, safety and the needs of multiple trades working at once.

01 · ACCESS

Active construction environment

Every arrival had to work within live site controls, vehicle movements and designated unloading areas.

02 · TIMING

Delivery windows tied to the program

Materials needed to arrive when site teams could receive and use them—not simply when a truck was available.

03 · HANDLING

Mixed load sizes and placement needs

Courier and crane-truck capability allowed vehicle selection to match the consignment and unloading requirement.

04 · COORDINATION

Multiple site stakeholders

Dulux Acratex requirements, site management, operators and dispatch all needed clear communication around each movement.

STAGE 01

Confirm the material requirement

Dulux Acratex load size, pallet quantity, collection point, site contact, access conditions and required delivery timing were confirmed before allocation.

STAGE 02

Match the vehicle to the load

Courier vehicles supported smaller and urgent requirements, while crane trucks provided capacity and controlled unloading for palletised render and texture materials.

STAGE 03

Coordinate the delivery window

Dispatch aligned each movement with site operations, helping prevent avoidable waiting, congestion and interruption to the works.

STAGE 04

Enter and operate within site controls

Drivers followed site access, safety and unloading procedures while working around other trades and construction activity.

STAGE 05

Unload and confirm completion

Materials were placed as required, delivery status was communicated and the next movement could be planned around actual site demand.

Foley Logistics crane truck and courier vehicle loaded with palletised render materials
Foley Logistics crane-truck and courier capability supporting palletised render and texture deliveries.
Why the model worked

Flexible fleet backed by active coordination.

This was not a single bulk drop. Foley Logistics created a repeat delivery model for Dulux Acratex materials that could respond to changing site demand while maintaining control of load size, delivery timing and unloading requirements.

Crane trucks handled the heavier palletised render and texture products, providing transport capacity and mechanical unloading in one movement. Courier vehicles supported smaller consignments and urgent requirements when the construction program could not wait for the next scheduled crane-truck run.

Each Gold Coast construction delivery was coordinated around the active Mondrian site at Burleigh Heads. Dispatch considered site access, delivery windows, vehicle suitability, load dimensions and the receiving team before allocating the movement.

50+ palletsRENDER & TEXTURE MATERIALS
50+ tonnesDELIVERED ACROSS THE PROGRAM
Crane trucksTRANSPORT & UNLOADING
Courier fleetURGENT & SMALLER LOADS
  • Scheduled and responsive material deliveries
  • Crane-truck transport for palletised Dulux Acratex products
  • Courier support for urgent construction materials
  • Site communication before arrival and unloading
  • Safe operation within a live high-rise construction environment

Project result: a dependable material-delivery pathway connecting Dulux Acratex supply requirements with the Mondrian construction program, supported by one accountable Foley Logistics operations team.

Capability demonstrated

Construction logistics that operate around the trade—not against it.

01 · DISPATCH

Responsive coordination

Movements planned around requested timing, vehicle availability, site access and the priority of the material.

02 · MIXED FLEET

Courier to crane truck

Different vehicle types used to support both urgent items and heavier palletised construction materials.

03 · SITE DELIVERY

Controlled arrival and unloading

Operators worked within active construction controls and coordinated placement requirements.

04 · MATERIAL FLOW

Volume delivered progressively

More than 50 pallets and 50 tonnes were moved in stages aligned with the construction program.

05 · COMMUNICATION

Trade and site alignment

Delivery details were coordinated between transport operations, the rendering contractor and site contacts.

06 · SCALABILITY

Built for repeat requirements

The model supported ongoing deliveries rather than treating each movement as a disconnected booking.

Project outcome

A dependable Dulux Acratex supply path into a demanding construction program.

Foley Logistics demonstrated the ability to support Dulux Acratex and a major builder through repeat, mixed-fleet construction deliveries. The work combined practical dispatch control with safe site execution and scalable transport capability.

50+ palletsDulux Acratex render and texture materials coordinated to site.
50+ tonnesConstruction materials transported across the program.
Mixed fleetCourier responsiveness with crane-truck capacity.
Program alignedDelivery scheduling connected to live site requirements.

Need materials coordinated into a live construction site?

Bring dispatch, vehicle selection, site communication and delivery into one accountable plan.

DISCUSS YOUR PROJECT →