Complex moves. One accountable project team.

Project Logistics & Facility Relocations

Complete planning, transport and on-site coordination for depot, warehouse, office, commercial and industrial relocations—from individual assets to multi-stage operational moves.

Discuss your relocationCall 1300 412 720

UP TO 30 EMPLOYEESFoley Logistics project workforce
UP TO 15 SUBCONTRACTORSAdditional full-time project support
1 KG–35 TBroad transport capability

A controlled move, not a collection of bookings

Relocate the operation without losing control of it

Moving a depot, warehouse, office or operational facility is a live business project. Every vehicle, asset, work area and destination must be sequenced around safety, access, continuity and the date the new site needs to function.

Foley Logistics can manage the relocation as one coordinated operation. We plan the movement program, allocate suitable vehicles and crews, coordinate site contacts, track progress and manage exceptions from the first collection through to final placement.

The scope can cover machinery, equipment, palletised freight, office assets, workshop contents, storage systems, vehicles and specialised units—supported by courier vehicles through to heavy rigid trucks, crane trucks, prime movers, tautliners and larger trailer combinations where assessed and suitable.

Foley Logistics representative coordinating the transport of large industrial machinery on a specialised trailer

Complete project coordination

One plan across every workstream

Site & asset review

Assess locations, asset categories, dimensions, handling needs, access conditions, operating constraints and destination readiness.

Relocation program

Build a staged movement schedule around business priorities, shutdown windows, handovers and critical-path activities.

Vehicle & crew allocation

Match courier, flatbed, Pantech, crane-truck, semi, prime-mover and specialist capability to each movement.

On-site coordination

Coordinate project contacts, loading areas, traffic flow, movement sequencing, unloading and handover requirements.

Safety & compliance

Plan around Chain of Responsibility, load restraint, vehicle suitability, site controls and task-specific risks.

Tracking & close-out

Maintain agreed status information, photographs, proof of delivery, exception reporting and completion records.

Foley Logistics project team standing with a branded crane truck during a coordinated relocation operation

Built around operational continuity

Facilities, equipment and assets we can coordinate

  • Depot and headquarters relocations
  • Warehouse and distribution-centre moves
  • Commercial office assets
  • Workshop tools and equipment
  • Machinery and industrial equipment
  • Palletised stock and consumables
  • Racking and storage components
  • Plant, fleet and specialised units
  • IT, records and packaged office equipment
  • Construction and project materials
  • Multi-site consolidation
  • Temporary staging and storage
Every relocation is scoped individually.
Weights, dimensions, packaging, lifting, permits, disconnection, reinstallation, dangerous goods and specialist trade requirements must be identified and allocated before the program begins.

Fleet depth for complex programs

From urgent courier movements to heavy project loads

Courier utes & vans

Urgent files, parts, boxed assets, keys and smaller priority movements.

Pantechs & taxi trucks

Protected transport for office assets, equipment and staged commercial freight.

Flatbeds & tautliners

Pallets, general freight, machinery and loads requiring flexible side or crane access.

Crane trucks

Transport and mechanical placement for suitable equipment and project assets.

Heavy rigid trucks

Higher-volume movements and commercial freight across active relocation stages.

Prime movers & semis

Larger consolidated loads, machinery and long-distance project movements.

Semi-forklift capability

Fork-on, fork-off support where site handling and access requirements suit the task.

Specialist combinations

Larger trailer configurations, including B-double capability where legally suitable, available and agreed.

Disciplined execution

A relocation workflow that keeps everyone aligned

01

Discover

Define sites, assets, timing, constraints, stakeholders and business-continuity priorities.

02

Survey

Validate weights, dimensions, handling, access, destination readiness and risk controls.

03

Sequence

Build a movement plan around shutdowns, critical assets, teams and operational handovers.

04

Mobilise

Allocate the project manager, compliance support, vehicles, operators and site resources.

05

Execute

Control collections, transport, progress communication, exceptions and placement.

06

Close out

Confirm completion, records, outstanding items, returns and final project handover.

Recent government relocation

Tweed Shire Council Headquarters & Depot Relocation

Foley Logistics recently coordinated the successful relocation of Tweed Shire Council’s headquarters and depot operations. The project required detailed planning, strong communication and careful coordination across vehicles, specialised units, equipment, staff and management.

20+

Vehicles & specialised units

More than 20 vehicles and specialised units formed part of the wider relocation scope alongside equipment, staff and management requirements.

2 WEEKS

Ahead of schedule

The relocation was successfully completed two full weeks ahead of the planned schedule.

ONE TEAM

Planning to completion

Foley coordinated the operation from project planning and fleet allocation through to on-site execution and completion.

Capability deployed

A diverse fleet was used throughout the relocation, including crane trucks, prime movers, Pantechs, semi-forklifts, courier vehicles and specialist transport equipment. Each resource was sequenced around the operational plan so the right capability arrived at the right stage.

The result demonstrated Foley Logistics’ ability to manage a significant government relocation with multiple workstreams, changing operational requirements and a firm completion objective.

Project managementFleet coordinationCompliance oversightSite communicationStaged movementsSchedule control
Tweed Shire Council and project stakeholders at the Murwillumbah depot following the coordinated relocation

Leadership and control

A project team scaled to the relocation

Large relocations need clear authority and defined responsibilities. Foley Logistics can structure a project team around the scope, with up to 30 Foley Logistics employees and up to 15 full-time subcontractors available for major project requirements.

  • Dedicated project manager
  • Compliance officer support
  • Up to 30 Foley Logistics employees
  • Up to 15 full-time subcontractors
  • Dispatch and scheduling coordinators
  • Drivers and crane operators
  • Courier and support crews
  • Loading and handling personnel
  • Client and site liaison
  • Escalation and contingency support

Final staffing is confirmed against the program, work areas, equipment, competencies, shifts and site-specific controls.

Foley Logistics crane truck prepared for an oversized project movement during early-morning operations

Tier 1 and government ready

Structured for demanding commercial environments

Single accountability

One operating plan, one project lead and one agreed escalation pathway across the relocation.

Detailed planning

Movement sequencing is built around access, operational priorities and destination readiness.

Scalable resources

Fleet and personnel can be increased around major stages, peak movement periods and critical handovers.

Compliance discipline

Vehicle, load, driver, site and Chain of Responsibility requirements are considered before dispatch.

Live coordination

Dispatch, project leadership, crews and client contacts operate through an agreed communication structure.

Contingency support

Backup fleet planning and operational escalation help manage breakdowns, delays and changing priorities.

Plan the move before the first vehicle arrives

Relocate your facility with one accountable logistics partner

Tell us what is moving, where it is going, when the new operation must be ready and what cannot stop during the transition. Foley Logistics can assess the scope and develop a staged relocation plan.

Discuss your relocationCall 1300 412 720